BSS-22 ECNEC-MEETING-2 LAST DHAKA

226

ZCZC

BSS-22

ECNEC-MEETING-2 LAST DHAKA

The day’s ECNEC meeting also approved a project for protecting Gobindi and Holdia areas under Saghata upazila and Katalmari area under Fulchori upazila of Gaibandha district from the erosion on the right embankment of River Jamuna with Taka 798.53 crore.

The Planning Division senior secretary said the premier in the meeting stressed that the main strategy for checking river erosion should be maintaining the usual flow of water and also keeping operational the river channel through conducting capital dredging and thus maintenance dredging.

Ashadul said the Prime Minister once again underscored the need for identifying the sandbanks (dubo chars) in the rivers and thus removing those through dredging as well as creating buffer zones for preserving water.

She also asked the concerned line ministries to keep an eye so that river silt does not block the usual flow of water.

Regarding the first revision of the Important Rural Infrastructures Development Project: Barishal, Jhalakathi and Pirojpur districts with an additional cost of Taka 305 crore, Ashadul said the Prime Minister directed the concerned ministries including the Local Government Division to give special attention so that the quality of work is ensured, the quality of bitumen in road construction and maintenance remains high and thus ensure that water could not remain for long time on roads.

He said Sheikh Hasina also directed for preparing a master plan for the rural roads and infrastructures with the Local Government Division as the lead Division.

The two other projects approved in the meeting are Waste System Development of Khulna City Corporation with Taka 393.40 crore and the first revision of Construction of Sheikh Hasina Sangskritik Palli with an additional cost of Taka 102.77 crore.

BSS/ASG/GM/GA/1633 hrs